Construction management

Eole Constructing manages the three phases of construction, upto final acceptance, without any reservations. All along these construction phases Eole Constructing manages and keeps control of the safety, schedules and the degree of quality in order to guarantee the long life of buildings. Eole Constructing is also able to adapt the project in order to keep it on track and within its time & budget constraints.

Construction planning phase:

  • Looking for a site for the base camp ;
  • Autorisation for high voltage network construction ;
  • Production of all documentation for tender or single authorisation ;
  • Identification of critical junction points ;
  • Risk analysis ;
  • Selection of companies most adapted to the construction work and project constraints ;
  • Advice and support to negotiate and conclude contracts ;
  • Study approval and validation.

Pre-construction preparation phase:

  • On site meetings (customer, farmer, local resident, elected representatives, road concession holders…) ;
  • Launching of topographic compliments if necessary ;
  • Siting of roads and buildings, aligned with the building permit ;
  • Management of geotechnical drilling and tests (foundations, roads, platforms) ;
  • Orders for additional investigation (if necessary) ;
  • Administrative procedures checking ;
  • Validation of current status for roads, private and public properties ;
  • Implementation of a road circuit for transportation onsite & offsite ;
  • Selection of final route for windturbine deliveries ;
  • Public Telecom network connection study ;
  • Grid connection schedule.

Construction phase:

  • Construction notification to companies ;
  • Checking of safety plan and safety rules ;
  • Technical coordination between companies, concessions, safety and technical controllers, Customer representatives, elected representatives, local residents ;
  • Control and management of environmental impact ;
  • HSE management ;
  • Participation in the administrative procedures for obtaining the ATTES-Eolien ;
  • Quality control and validation of works ;
  • Accounting of executed works to be invoiced ;
  • Reporting of works progress ;
  • Customer assistance for works acceptance ;
  • Checking of works before end of guarantee period.

Actu

January 2026

The entire Eole Constructing team is delighted to welcome Isabelle Guillard. With 12 years of experience as a surveyor in public works and strong hands-on expertise—particularly gained through earthworks carried out for several wind farm projects—Isabelle joins our team as a valuable addition.

Info

Access studies throughout France.

In 2024, EOLE CONSTRUCTING carried out 14 access studies by integrating increasingly larger wind turbines (Ex : Vestas V162 or Siemens Gamesa SG 170).

 

In addition to the study report, EOLE CONSTRUCTING debriefs the site visit and presents the constraints and solutions to the development teams.

 

Thanks to its experience and expertise, EOLE CONSTRUCTING is able to identify the routes best suited to the project owner’s needs.